COST MODEL · OPEN ASSUMPTIONS

Calculator

Understand what your legacy system costs. Use your own numbers to estimate when modernization could pay back.

Calculations run on this page. Inputs are sent to the server only when you request a report.

01Your current annual costs

Only the currency label changes. No exchange rate conversion.

02Assumptions

Selected scenario: Cautious

20%
Assumption

A 20% maintenance-cost reduction in the cautious scenario is a scenario assumption you can adjust.

30%
Assumption

A 30% licence and infrastructure-cost reduction in the cautious scenario is a scenario assumption you can adjust.

40%
Assumption

A 40% downtime-cost reduction in the cautious scenario is a scenario assumption you can adjust.

50%
Assumption

A 50% manual-work cost reduction in the cautious scenario is a scenario assumption you can adjust.

5%
Assumption

A 5% annual existing-system cost increase in the cautious scenario is a scenario assumption you can adjust.

03Modernization investment

Calculated results

Annual savings

$0

First year

5-year difference

$0

After investment

Break-even

—

With $0 invested

Modernization does not produce cost savings under these assumptions.

Cumulative cost over time

Investment is paid today; costs accrue evenly within each year.

  • Existing system
  • Modernized (including investment)
$0$0.2$0.4$0.6$0.8$1TodayYear 1Year 2Year 3Year 4Year 5$0$0
$0$0.2$0.4$0.6$0.8$1TodayYear 2Year 5$0$0
Show as a table
Cumulative cost over time
YearExisting systemModernized (including investment)
Today$0$0
Year 1$0$0
Year 2$0$0
Year 3$0$0
Year 4$0$0
Year 5$0$0

Annual cost by category

First year · excludes the one-time investment

  • Today
  • After modernization
Maintenance and developmentLicenses and infrastructureDowntimeManual work$0$0$0$0$0$0$0$0
Maintenance and developmentLicenses and infrastructureDowntimeManual work$0$0$0$0$0$0$0$0
Show as a table
Annual cost by category
CategoryTodayAfter modernization
Maintenance and development$0$0
Licenses and infrastructure$0$0
Downtime$0$0
Manual work$0$0

This is an estimate. Figures are refined after a Legacy Health Check.

04 / PDF REPORT

Take the calculation with you.

Your inputs, assumptions and charts in one file.

Correct the invalid calculator field first.

How do we calculate this?

Costs accrue evenly within each year. Modernized annual costs stay constant; legacy costs grow at the selected rate. The model excludes taxes, financing costs and the time value of money.

Downtime cost
downtime = downtimeHoursPerMonth × 12 × downtimeCostPerHour
Manual work cost
manual = manualHoursPerWeek × 52 × manualCostPerHour
Current annual cost
M0 = maintenance + licenseInfra + downtime + manual
Modernized annual cost
M1 = Σ category × (1 − category_reduction)
Legacy cost in year t
M0 × (1 + g)^(t−1)
Cumulative legacy cost
C(T) = Σ_{t=1..T} M0 × (1 + g)^(t−1)
Modernized cost including investment
Mod(T) = investment + T × M1
First-year savings / 5-year difference
M0 − M1 / C(5) − Mod(5)
Investment ceiling when the budget is unknown
maxInvestment(N) = C(N) − N × M1

Break-even is the first time C(t) = Mod(t), using linear interpolation between year boundaries. Investment is paid at t = 0. If M1 ≥ M0, no break-even is shown. When break-even takes more than 5 years, the chart extends to 10; if it still does not occur, this is stated explicitly.

When the budget is unknown, the chart and five-year difference use the investment ceiling. If the ceiling is zero or negative, zero is shown and the selected payback target is marked as unmet.

Cautious, Moderate and Optimistic scenarios are editable assumptions, not measurements. Source badges beneath the sliders explain their rationale.