04 / ENGINEERING ATLAS

Knowledge for the next step.

Explore the migration path. Check the support date. Give your decision a shared vocabulary.

01 / MIGRATION PATHS

From where, to where?

Each guide starts with the constraints. Then comes the sequence, the acceptance checks and the rollback decision.

  1. .NET Framework to .NET 10 Migration Guide

    A .NET Framework to .NET 10 checklist for application models, NuGet packages, Windows dependencies, data verification and rollback.

    Updated
  2. Java 8 to Java 21 Migration Checklist

    Check JDK distribution, libraries, reflection and encoding when migrating Java 8 to Java 21. Plan representative load tests and rollback.

    Updated
  3. PHP 7 to PHP 8 Migration: Steps and Checklist

    A PHP 7 upgrade checklist covering a supported PHP 8 target, package compatibility, behavior, data checks, deployment and rollback.

    Updated

02 / REFERENCE DESK

Dates change. Follow the source.

The calendar is a starting point for your inventory. Distribution, licensing and support scope are stated alongside each record.

Open the end-of-support calendar →

UPCOMING SECURITY SUPPORT DEADLINES

.NET 8Angular 20PHP 8.2

Only records with a verified day are listed here. An unknown date does not mean indefinite support.